THE VAULT – Construction Kit

Posted by
|
Posted in DAZ | Poser | Carrara, Scenes & Props

Full49109

Assembly procedure is very easy and offers many different combinations. There’s 6 main corridors segments: I, L, X and T shaped corridor, corridor with small sliding door, and segment with large, rolling airlock. You’ll also get sliding door, and rolling airlock door prop. Segments are constructed to connect together perfectly without any gaps. Because I’m limited to only 4 images on this page.

49109b

dl-qf181
Roddy for Kids4
Tin-Pan-Alley

Comments

Add a comment

You must be logged in to comment.